GEM Engserv Pvt. Ltd is an ISO 9001:2015 certified organization, certified by TUV India in accreditation with National Accreditation Board for Certification Bodies (NABCB).

GEM TRAQ - Labour Movement Tracking at Construction Sites

Enquire to receive our proposal today!

Our Business Development Manager will call you instantly to understand your requirement

GEM TRAQ

Implement efficient people tracking and monitoring system at the construction sites.

In this COVID scenario, we have launched a robust Labour Movement Tracking System GEM TRAQ which is a completely contactless system enabling labourers to be identified with their individual unique QR code. This system will help you to track productivity and keep efficient access control to labourers entry-exit on site. GEM TRAQ is not only for COVID scenario but also will be useful after COVID for Labour Movement Tracking on sites.

EXISTING LABOUR TRACKING PROCESS AT SITE

1. REGISTRATION VIA WEB PORTAL
2. DOWNLOAD APP AND LOGIN
3. SCAN QR CODE ON THE SITE

BENEFITS OF USING GEM TRAQ

GEM TRAQ is a cost-effective and feature-loaded robust labour movement tracking system. The ability to integrate and customise this app are endless. This app generates a unique QR Code which acts as an identity card for an individual with respect to the assigned projects; Some key benefits are as below:

  1. Unique identification means – No Buddy Punching happens at the site so that laborers carry their own assigned QR code printed cards or it’s soft copy at site.
  2. Random inspection can happen by the security to check if there are any fraudulent entries to the site (by just scanning the QR code of any random individual).
  3. All Data is stored digitally on a server for better data security and to avoid data loss.
  4. Real-Time reporting to seamlessly transmit data to the management.

COVID COMPLIANCE - MAINTAIN VISITOR CONTROL

Control and restrict the site visitors by proper entry / exit mechanism on site.

COMPLETE CONTACTLESS SYSTEM

100% contactless system ensuring to limit the spread of viruses on project sites.

LABOUR AVAILABILITY RECORD

Current / Historical Labour availability status on site available at any given point in time on the server.

PRODUCTIVITY ANALYSIS

Real-time productivity analysis using labour entry/exit data on sites for daily productivity reports.

THERMAL SCANNER INTEGRATION

Temperature scanned at the entry / exit can be recorded for an individual entity and included in reports.

PRODUCTIVITY ANALYSIS

Pasting allotted QR Code stickers on PPEs (Helmets, Jackets, Shoes, etc ) to avoid COVID spread.

STAGGER LABOUR ENTRY TIMINGS

Stagger labour work timings to avoid crowded entry / exit on sites for better productivity.

INTEGRATE LABOUR COMPLIANCE DETAILS

Capture Labour compliance details like PF, ESIC, BOCW etc. for HR-related activities.

PRICING PLANS

* Pricing shown are indicative and of a typical real estate project. Pricing plan may vary depending on the complexity and type of project.

AUTHENTICATE
4,999*

Per Project

REGISTER WORKERS

๐Ÿ‘

SCAN WORKERS AT ENTRY / EXIT

๐Ÿ‘

AUDIT WORKERS ON SITE

โ›”๏ธ

RECORD TEMPERATURE

โ›”๏ธ

PPE COMPLIANCE (optional)

โ›”๏ธ

DAILY ATTENDANCE REPORT

๐Ÿ‘

ENTRY / EXIT REPORT

โ›”๏ธ

LABOUR HOURS TRACKING

โ›”๏ธ

LABOUR REPORT BY TRADE

โ›”๏ธ

BILLING REPORT

โ›”๏ธ

CUSTOM CHANGES = ONE TIME ADVANCE LUMPSUM CHARGES

โ›”๏ธ

COMPLIANCE
14,999*

Per Project

REGISTER WORKERS

๐Ÿ‘

SCAN WORKERS AT ENTRY / EXIT

๐Ÿ‘

AUDIT WORKERS ON SITE

๐Ÿ‘

RECORD TEMPERATURE

๐Ÿ‘

PPE COMPLIANCE (optional)

๐Ÿ‘

DAILY ATTENDANCE REPORT

๐Ÿ‘

ENTRY / EXIT REPORT

๐Ÿ‘

LABOUR HOURS TRACKING

๐Ÿ‘

LABOUR REPORT BY TRADE

โ›”๏ธ

BILLING REPORT

โ›”๏ธ

CUSTOM CHANGES = ONE TIME ADVANCE LUMPSUM CHARGES

โ›”๏ธ

ENTERPRISE
19,999*

Per Project

REGISTER WORKERS

๐Ÿ‘

SCAN WORKERS AT ENTRY / EXIT

๐Ÿ‘

AUDIT WORKERS ON SITE

๐Ÿ‘

RECORD TEMPERATURE

๐Ÿ‘

PPE COMPLIANCE (optional)

๐Ÿ‘

DAILY ATTENDANCE REPORT

๐Ÿ‘

ENTRY / EXIT REPORT

๐Ÿ‘

LABOUR HOURS TRACKING

๐Ÿ‘

LABOUR REPORT BY TRADE

๐Ÿ‘

BILLING REPORT

๐Ÿ‘

CUSTOM CHANGES = ONE TIME ADVANCE LUMPSUM CHARGES

๐Ÿ‘